Arkansas
Jackson County, AR
Tower‘s Arkansas 25MW data center is located in Jackson County, AR. The site is primarily powered by clean nuclear energy and is currently undergoing development to 50MW.
- 99% uptime
- Air cooled with water curtains
- Lease or hosting structure
- Containerized
- Dual Fiber Access
- Largely clean nuclear power
- No special curtailment software needed
- Municipal water access
- Office and repair facility
- Inference and AI training suitable
Texas
Lavaca County, TX
Tower‘s Texas data center is located in Lavaca County, TX, approximately an hour from Austin. The site has a total capacity of 72MW, with 12MW online and 60MW expansion capacity.
The Opportunity
Intrigued By Our Strategy Behind the Power Shift?
Contact us to arrange a call with our executive team to learn how Tower Digital is bridging the AI power gap with a capital-efficient, high-yield infrastructure roll-up. Learn why timing, team, and strategy give us the edge in this once-in-a-generation investment opportunity.